December 15, 2006
Looking southwest, the pavement base course was installed on Ramp A which connects Route 70 westbound with Main Avenue. |
|
Looking east, the pavement course was installed on the widened portion of Main Avenue. |
|
Looking south towards Route 70, the pavement course and curbing was installed on the widened portion of Riviera Drive. |
|
The pavement course was installed along Route 70 eastbound, west of River Road. |
|
The curing membrane was installed over Span 1 of the bridge deck. The deck screed machine used to finish the deck is in the background. |
|
.
|
|