December 16, 1998
 |
Crews are assemblying the concrete forms for the east abutment wall which will be part of the future southeast flyover ramp.
|
 |
View is from the embankment of the future southeast ramp. A detention pond is in the foreground. Traffic on Route 17 southbound is in the background.
|
 |
View is from the future southeast ramp. Construction of the north abutment of the southeast flyover ramp is shown on the right. Reinforcement steel for abutment wall in shown in the foreground.
|
.
|
|