| Construction Updates |
|
Route
52 Causeway
Bridge Replacement
Overview |
|
Frequently
Asked
Questions |
|
Community
Outreach |
|
Community
Enhancements |
|
Final
Environmental
Impact Statement |
|
Technical
Drawings |
|
Landscape
Drawings |
|
Video |
| Photos |
| Archived Photos
2012
|
2011 |
2010 |
2009 |
2008 |
December 29, 2008 |
November 11, 2008 |
September 29, 2008 |
August 20, 2008 |
July 31, 2008 |
June 30, 2008 |
May 21, 2008 |
April 23, 2008 |
March 31, 2008 |
February 14, 2008 |
January 31, 2008 |
|
2007 |
2006 |
|
|


Archived Photos
(click on thumbnail photos to enlarge in bottom window)
April 23, 2008
|
|
|
Crews are placing bituminous pavement on the temporary ramp. |
Piles for the southbound bridge are being installed inside a cofferdam. |
Crews are pouring the footing of a southbound pier from the bridge deck to of the northbound bridge. |
|
|
|

Crews are driving sheet piles for the west bulkhead adjacent to the recently constructed piers for the southbound bridge. |

The prestressed concrete girder is being lifted into place on the southbound bridge adjacent to the west bulkhead (on left). |

The columns for a southbound pier is being formed and poured. To the left, precast concrete girders are being delivered. To the right, sheet piles are being driven in preparation for the next footing pour. |
|
.
|
|